THE PROJECT
A challenge met
with precision.
American Hydro was subcontracted to perform removal of approximately 90,000 square feet of urethane coating from the Erie Garage parking structure in Erie, Pennsylvania. We achieved removal rates of over 7,000 square feet per day. We also provided a 40,000 psi pump with a hand lance to achieve the trim work necessary for complete removal. The trim work included the edges along the wall as well as the faces of the curbs. The contractor was very pleased with the production and the quality of the underlying concrete surface following the removal of the coating.
From the job site
1 IMAGELET’S GET TO WORK
A challenging project?
We’re built for it.
Tell us about your structure, your schedule,
and the concrete you need removed.