HYDRODEMOLITION SPECIALISTS / NATIONWIDE SERVICE410.574.8470

Project case study

Fletcher St. Garage

A double-nozzle robot delivers on an aggressive construction schedule.

Fletcher St. Garage
PROJECT TYPEFlat Work
PROJECT SCOPE200,000 square feet of removal
Discuss a similar project

THE PROJECT

A challenge met
with precision.

American Hydro was subcontracted to perform concrete removal to a depth of approximately 5 inches for a total quantity of 200,000 square feet. This project was challenging due to the aggressive schedule for completion. In addition, to the demanding schedule, the concrete strength was approximately 6,000 psi. In order to meet the schedule, our proprietary double nozzle robot was employed. With twice the power of our traditional robot, the double nozzle robot allows for extraordinary production on projects such as this. The general contractor was surprised and very pleased with the production achieved from this unit which allowed the hydrodemolition schedule to be completed several weeks early.

View all projects

LET’S GET TO WORK

A challenging project?
We’re built for it.

Tell us about your structure, your schedule,
and the concrete you need removed.

Discuss your project